Harrisburg High School, Pa.
A long time in the making, Harrisburg High School’s stadium finally got the renovation it was seeking in the summer of 2022, and ATT Sports was thrilled to partner with Schlouch Incorporated, the general contractor, on the project.
The massive facelift, designed and overseen by JMT Architecture, included a new turf field by Sprinturf, and ATT Sports installed a brand new two-color Rekortan M “sandwich system” running track, in the Cougars’ black and grey. The track not only looks great, but will serve the students in Pennsylvania’s capitol city for more than the next decade.