Dedicated to Quality Work

Home
Products
Installations
Testimonials
The ATT Corporate Team
President
Tony Cunningham, CTB*
Operations
Cheryl Morton
Bryan Mitterling, CTB*
Accounting
Susan Cunningham

Director of Office Security
Alfie

Kean University, Union, NJ
Spurtan BV System


Owen J. Roberts High School, Pottstown, PA
Stobitan® SC


West Perry High School, Elliottsburg, PA
 Stobitan® SW


Beach Channel High School
New York City School Construction Authority
Located in Rockaway Park, NYC

Spurtan BS System


Canton High School, Canton, Ct
Spurtan BS System


Goucher College, Towson, MD
Rekortan retop. Private project selected by Whiting-Turner Construction Company.



Delaware Valley School District, Milford, PA

Indiana University, Bloomington, Indiana
Rekortan Re-Top completed on time for the Indiana University 200 m banked indoor track.
Head Coach  Ron Helmer and assistant Jay Arthur.



Attleboro High School, Attleboro, MA
The Hun School, Princeton, NJ

O'Brien Field at Eastern Illinois University gets new Rekortan M99 full pour surface



The State University at Oswego has pumped new "life" into their indoor track and field facility with a resurfacing completed by ATT Sports.
Link to SUNY Oswego Installation Page

ATT Sports, Inc. in partnership with Rekortan and Spurtan, the best in the business
Rekortan - The top of the line in full pour polyurethane tracks
Spurtan - Quality sandwich system technology for high schools and college facilities

2012 Oswego Field House
2012 Springfield Chestnut Hill Academy - Philadelphia, PA
2012 Edison Park Installation - Edison, NJ
2012 Dover Middle School - Dover, NJ

ATT Sports, Inc. wishes to announce that President Tony Cunningham and Associate Bryan Mitterling have both gained Certified Track Builders by American Sports Builders Association.  ATT Sports, Inc is only one of two companies in the nation that has two or more CTB individuals on staff.  Link to Certification Page


West Point Prep on the Henry Hudson River located on the grounds of West Point, West Point, NY.
This project was completed in September, 2011 and is a Spurtan BV surfacing product.



2011 Projects - From Maine to Washington, DC

Bowdoin College, Me

The transition between the new track surface and the pre-existing infield surface was very well done. All around the track the transition is consistent, gradual, and clean. 
My favorite part of the renovation is the way we gained so much volume in the surface. The runners are back on campus now and have praised the re-surfaced track with comments such as: 
“The new track is so bouncy”.......
“The new track is so soft”.....
“It’s like running on air.”

We have loved the Rekortan surface for the past 23 years, and I am hopeful that the re-surfacing work you did will extend the life of the track for another 15-20 years. 
I appreciate that you guys were very good listeners about the challenges we faced with a 1987 indoor track needing to be brought up to 2012 standards for events, safety, striping, and performance. You helped us formulate a beautiful re-design of the surface with creative advice.
Your foreman was especially helpful, clever, and generous. He and the crew worked very well together. Their pride in the craftsmanship required of the renovation was apparent. It’s a tough business to be moving crews around the country, but your crew had outstanding teamwork on our site. Thanks for the great planning and attention to detail that went into the Bowdoin track renovation. 

Peter Slovenski, Head Track Coach Bowdoin College

Links to Installations for 2011
Norton HS, Ma
Grafton HS, Ma
Windsor, NY

Alden, NY
Military Academy Prep School – West Point, NY
St. Joes College, LI
, NY
Wagner HS, Station Island, NYC
Bound Brook, NJ
Foley Field, Bloomfield, NJ
Indoor “Bubble” Rutgers University, New Brunswick, NJ
Bridgeton HS, NJ
Bergen County Community College, NJ
Hillside High School, Hillside, NJ
Eastside HS, Paterson, NJ
Richard Stockton College of New Jersey
Montclair HS, NJ
Trenton Catholic HS, NJ
Wayne Valley HS, NJ
Wayne Hills HS, NJ
Hillside HS, NJMt. Lebanon, HS, Pa
Malvern Prep School, PaCalifornia Univ. of Pa
Dallas HS, Pa
Norristown HS, Pa
Red Lion HS, Pa
Delaware Valley Christian Academy, Delaware
Polytech HS, Woodside, Delaware
Cape Henlopen HS, DelawareHD Woodson HS, DC


ATT Sports, Inc. The choice for the Prep School League
1. Lawrenceville School - 2009 New Track Outdoors
    Lawrenceville School - 2010 Resurfacing Indoors
2. Malvern Prep - 2011 New Track
3. Mercersburg Academy
4. Friends Central Academy
5. Episcopal Academy
6. The Hill School
7. Pennington School
8. Tower Hill School (elayer)
9. Penn Charter School
10. Germantown Friends School



Bowdoin College gets new Rekortan surface for its Fieldhouse
Bowdoin College, located in Brunswick, Maine has just received a new Rekortain full pour surface on its original Rekortan indoor track facility installed in the late 1980's.  The resurfacing took approximately 3 weeks  and included doing both the track oval and the infield and perimeter outside the track.
Photos


Recently resurfaced Pt. Jefferson track site of national high school steeplechase record
Note received from Coach Don Slingerland of Pt. Jefferson

We had the Suffolk County State Qualifier on our (your) track last Saturday and Mary Kate Anselmini set a National Record in the 2000 Meter Steeplechase.  Everyone loves the track.
Photos

Who We Are

ATT Sports, Inc. started operations in 2004. The founders Anthony Cunningham (30 years experience), Cheryl Morton (22 years experience) and Dennis O’Donnell (18 years experience) are the original owners and are now joined by 42 current employees. The Company was originally named American Track and Turf, Inc. and amended to ATT Sports, Inc for brevity and flexibility in the fulfillment of our mission.

In the first year of operation we resurfaced and built tracks in New Hampshire, Massachusetts, New Jersey, New York, Connecticut, Pennsylvania, Washington DC, Maryland and Ohio. We installed polyurethane track on Colligate Projects, Army Corps of Engineers, Secondary Schools, and for Parks and Recreation Departments. Overall, we placed over 1.2 million square feet of new polyurethane surfacing, on time, and zero loss time due to accidents.
Concluding the sixth year of business we expanded operations to include the entire northeast of the United States and placed over 900,000 square feet of elastic layer for the three major turf companies operating in the Northeast. We concluded several collegiate projects including University of Buffalo, Georgetown University, East Stroudsburg University, Gordon College, Brandeis University, Rutgers University, Clarion University, Gwynned Mercy College, Alvernia University, Juniata College, Dickinson College, Messiah College, Princeton University, and Lehigh University.

As we go into our eighth year of operation the future is very bright. The demand for resurfacing, repair and new construction has never been greater. We separate ourselves from our competition because while they have to sell “quality product and workmanship,” we take for granted that quality is implicit in our operation. We have found that the key to a successful project starts with listening to the customer, providing an accurate and timely proposal, following specifications, communicating with all parties to insure the completion of the project in the time expected. The “quality of our product or workmanship” is never a selling point, it is a “given” .